Did the new shift improve finishing quality?

Matched comparison · Fictional study

Study design

Match line-weeks on fabric family, order size and operator experience. Alternate shift patterns where staffing permits.

Instrument and data fields

Record line, week, shift pattern, fabric, inspected batches and batches requiring rework.

Simulated evidence

Matched cotton lots: 12 of 120 reworked under staggered shifts, 17 of 120 under current shifts. Synthetic lots: 14 of 100 versus 13 of 100.

Check before drawing a conclusion

Write down the comparison you would make and the unit each row represents. Identify one explanation the study design cannot rule out, then describe how it would affect the decision.

Reveal the worked analysis

Cotton rework falls by about 4.2 points, while synthetic rework rises by 1 point. Run another rotation and monitor handoff defects by material.

Matched weeks control measured differences only. Unrecorded machine condition or order complexity can still bias the comparison.

Apply the result to the business case